
Construction sites
The Cal/OSHA baseline for a framing, grading or concrete crew. Pair it with a handwash station to stay compliant.
The unit you picture. Non-flush, hand sanitizer dispenser, vented roof and a lockable door. Rated for a full crew on a weekly service cycle, delivered the same day you call.

One standard unit covers ten workers on a 40-hour week. Past that, add a unit or add a service day.

The Cal/OSHA baseline for a framing, grading or concrete crew. Pair it with a handwash station to stay compliant.

One unit on a monthly rate, set off the driveway and out of the neighbor's sightline for the length of the build.

Ordered in banks with ADA units mixed in to permit percentage, pumped overnight between event days.
Same-day and next-day delivery available.
Tell us the site and the headcount. We tell you the unit count and the price while you are still on the phone.
Call and we'll tell you whether it lands today or tomorrow, with a photo of exactly where we set it.
Pumped, sanitized and restocked on a fixed day of the week, whether or not anyone complained.
Anything not here, a dispatcher will answer on the first call.
Two-bay, 22 gal fresh water. Required alongside toilets on most sites.

Ground-level entry, 60" turning radius. Code-compliant.

Foot-pump flush, sink, mirror. Guest-ready.
Certified lift points. Rated to a 4-point pick.
Sacramento · Elk Grove · Roseville · Folsom · Davis · Woodland · Rancho Cordova